Extension of the waste water treatment plant
The waste water treatment plant was extended by 2 Fermenters planed by AAT. Also included in our service package were the following WWTP equipment components:
- 2 Agitators
- 2 gas storage tanks with a volume of 540 m³ each
- flare with a gas volume stream of 150 m³ per hour
AAT Abwasser- und Abfalltechnik GmbH
Konrad Doppelmayr Straße 17
6960 Wolfurt
Austria
Tel.: +43/5574/65190-0
Fax.: +43/5574/65190-99